Quick contact info

Scorpion Arabia for Contracting Services was developed in order to meet the growing needs for trenchless technology and pipeline service demands in the kingdom of Saudi Arabia and other GCC counties.

icon_widget_image Sunday-Thursday: 7am to 3pm; Friday - Saturday: closed icon_widget_image Office no.111, Po.Box no.46734 Bldg No. 3939, Al Hadhrah Ghirnatah Dist Unit No.1, Zip code 13242, 8080 Riyadh Kingdom of Saudi Arabia icon_widget_image +966 1 3501 4444 +966 55 329 1771 icon_widget_image info@scorpion-contracting.com

Completed Projects

HORIZONTAL DIRECTIONAL DRILLING
Projects
ARAMCO

Rastanura

Pilot 14” reaming and pull in big rigs drill pipe

Length: 230 M

ARAMCO

Nesma Project KM 19

Pilot 14” reaming and pull in big rigs drill pipe

Length: 330 M

ARAMCO

KM-19 Highway-95

Installation of 2x125mm HDPE pipes

Length: 124 M

Sindalah Island

Neom

18″ Steel pipe crossing (Water)

Length: 2750 M

Sindalah Island

Neom

14″ Steel pipe crossing (electric & FOC)

Length: 2750 M

Sindalah Island

Neom

14″ Steel pipe crossing (electric & FOC)

Length: 2750 M

Sindalah Island

Neom

20″ Steel pipe crossing (Water)

Length: 2750 M

Sindalah Island

Neom

20″ Steel pipe crossing (Water)

Length: 2750 M

Sindalah Island

Neom

18″ Steel pipe crossing (Water)

Length: 2750 M

ARAMCO

KM-19 Highway-95

Installation of 6″ Steel pipe

Length: 130 M

ARAMCO

KM-19 Highway-95

Installation of 12″ Steel pipe

Length: 130 M

ARAMCO

Location road no. 611

Installation of 2x125mm HDPE pipes

Length: 105 M

ARAMCO

Location road no. 611

Installation of 6″ Steel pipe

Length: 115 M

ARAMCO

Location road no. 611

Installation of 12″ Steel pipe

Length: 115 M

ARAMCO

QATIF

4″ HDPE PIPE

Length: 120 M

ARAMCO

QATIF

12″ HDPE pipe

Length: 120 M

ARAMCO

QATIF

12″ HDPE pipe

Length: 120 M

ARAMCO

QATIF

12″ HDPE pipe

Length: 120 M

ARAMCO

Khafji KM 58

Installation of 125×2 HDPE pipe

Length: 310 M

ARAMCO

Khafji

12” PipeSize at KM .48+337.942  pkg-17

Length: 78 M

ARAMCO

KM-13 Tanajib Road

Installation of 12″ Steel pipe pkg -16

Length: 139 M

ARAMCO

KM-12+682

Installation of 12″ Steel pipe pkg -16

Length: 115 M

ARAMCO

KM6+971

Installation of 12″ Steel pipe pkg -16

Length: 120 M

ARAMCO

KM24

Installation of 6″ Steel pipe pkg -16

Length: 264 M

ARAMCO

KM13

Installation of 6″ Steel pipe pkg -16

Length: 240 M

ARAMCO

QATIF Location 3+300

Installation of Pipe size 12″ steel pipe

Length: 75 M

ARAMCO

km215

12” Pipe Size at KM .215 pkg-17

Length: 83 M

ARAMCO

km216

12″ pipe size km216 pkg-17

Length: 79.2 M

ARAMCO

KM209

12″ pipe size km209 pkg-17

Length: 168 M

ARAMCO

km 132

12″ pipe size km 132

Length: 150 M

ARAMCO

KM 28+360

2*125mm hdpe pipe

Length: 156 M

ARAMCO

KM 28+360

20″ Casing pipe & 12″ Product pipe 

Length: 156 M

ARAMCO

KM35+740

           2*125mm hdpe pipe

Length: 150 M

ARAMCO

KM 11+700

12″ Steel pipe

Length: 200 M

ARAMCO

KM 35+740

12″ Steel pipe 

Length: 350 M

ARAMCO

KM 42+613

                12″ Steel pipe

Length: 660 M

ARAMCO

KM 42+613

2*125mm hdpe pipe

Length: 660 M

News

Latest

    Sorry, no posts matched your criteria.