This process of Directional Drilling is used for installing Water, Oil & Gas pipelines, telecommunication and power cable conduits, installations underwater channel crossings, roadways, shore approaches and environmentally sensitive areas and highly congested areas like under pipeline corridors. Also drilling under sand dunes for Aramco has successfully been done in Shaybah empty quarter.
50 Ton Rig
SUCCESS IN DIRECTIONAL DRILLING
- Project planning.
- Using the correct drilling rigs and support equipment.
- Quality drilling tooling to drill all ground conditions.
- The use of the correct drilling mud.
- And most important experienced people to run the equipment that can put pipe in the ground to the client’s satisfaction.
Maxi Rig
First pipe pulled on Neom – Sindalah Island utility contract for Rawabi
Projects Completed
Maxi Rig Intersection
Location | Pipe Dia | Length |
---|---|---|
Brahmaputra River | 6 inch | 3558m |
Mahanadi River | 12+6 inch | 3200m |
Vashi Creek, Mumbai | 18+6 inch | 2528m |
Manar River | 18 ich | 2532m |
Taiwan Dudu Canal | 26 inch | 2532 m |
Taiwan Wusi River | 26 inch | 709m |
Projects Completed
Maxi Rig
Location | Pipe Dia | Length |
---|---|---|
Umbrhat Beach | 42 inch | 1150m |
Ganga River | 24 inch | 2330m |
Mahandi River | 12 inch | 3200m |
Yamuna River | 36 inch | 201m |
Vashi Creek, Mumbai | 18 inch | 2523m |
Brahmaputra River | 6 inch | 3558m |
Completed Projects
- We provide the detailed HDD design to make sure the client has a successful project completed within time using the correct equipment for all ground conditions.
- Trenchless route assessment to plan and plot the bore profiles with method statements being provided with project planning and scheduling.
- In house mud engineers assure that the project drilling mud design is followed to suit the ground conditions of each project. Note drilling mud is one the most important aspects to a successful directional drilling project.
- Project Drilling Equipment and support equipment, we make sure the correct equipment is used to make sure the project is a success and completed in the time schedule.
- Our strength is in the equipment we can make available from Drilling rigs from 50 ton to 500 ton with all support equipment like mud pumps and mud cleaning systems to the highest standard.
- As you can see from the projects completed with the Maxi rigs using intersection technology, we can do crossing length up to 3600 meters in length.
- The key management and drilling personnel are having 15-20 years’ experience in the directional drilling industry which is the key to success in directional drilling long crossings
Equipment Available
Directional Drilling Rigs
Rig Capacity | Quantity |
---|---|
30-60 Ton | 6 |
90-150 Ton | 8 |
200-350 Ton | 6 |
400-500 Ton | 4 |
Projects
Construction
Contemporary Villa
Facilisis at vero eros et accu qui blandit praesent luptatum zril delenit augue duis autem vel eum iriure dolor in hendrerit.
Construction
House of Cards
Facilisis at vero eros et accu qui blandit praesent luptatum zril delenit augue duis autem vel eum iriure dolor in hendrerit.
Construction
Kitchen and Living
Facilisis at vero eros et accu qui blandit praesent luptatum zril delenit augue duis autem vel eum iriure dolor in hendrerit.