Quick contact info

Scorpion Arabia for Contracting Services was developed in order to meet the growing needs for trenchless technology and pipeline service demands in the kingdom of Saudi Arabia and other GCC counties.

icon_widget_image Sunday-Thursday: 7am to 3pm; Friday - Saturday: closed icon_widget_image Office no.111, Po.Box no.46734 Bldg No. 3939, Al Hadhrah Ghirnatah Dist Unit No.1, Zip code 13242, 8080 Riyadh Kingdom of Saudi Arabia icon_widget_image +966 1 3501 4444 +966 55 329 1771 icon_widget_image info@scorpion-contracting.com

HORIZONTAL DIRECTIONAL DRILLING (HDD)

This process of Directional Drilling is used for installing Water, Oil & Gas pipelines, telecommunication and power cable conduits, installations underwater channel crossings, roadways, shore approaches and environmentally sensitive areas and highly congested areas like under pipeline corridors. Also drilling under sand dunes for Aramco has successfully been done in Shaybah empty quarter.

50 Ton Rig

SUCCESS IN DIRECTIONAL DRILLING

  • Project planning.
  • Using the correct drilling rigs and support equipment.
  • Quality drilling tooling to drill all ground conditions.
  • The use of the correct drilling mud.
  • And most important experienced people to run the equipment that can put pipe in the ground to the client’s satisfaction.

Maxi Rig

First pipe pulled on Neom – Sindalah Island utility contract for Rawabi

Projects Completed
Maxi Rig Intersection

LocationPipe DiaLength
Brahmaputra River6 inch3558m
Mahanadi River12+6 inch3200m
Vashi Creek, Mumbai18+6 inch2528m
Manar River18 ich2532m
Taiwan Dudu Canal26 inch2532 m
Taiwan Wusi River26 inch709m

Projects Completed
Maxi Rig

LocationPipe DiaLength
Umbrhat Beach42 inch1150m
Ganga River24 inch2330m
Mahandi River12 inch3200m
Yamuna River36 inch201m
Vashi Creek, Mumbai18 inch2523m
Brahmaputra River6 inch3558m

Completed Projects

No data found! Please upload valid CSV file.
  • We provide the detailed HDD design to make sure the client has a successful project completed within time using the correct equipment for all ground conditions.
  • Trenchless route assessment to plan and plot the bore profiles with method statements being provided with project planning and scheduling.
  • In house mud engineers assure that the project drilling mud design is followed to suit the ground conditions of each project. Note drilling mud is one the most important aspects to a successful directional drilling project.
  • Project Drilling Equipment and support equipment, we make sure the correct equipment is used to make sure the project is a success and completed in the time schedule.
  • Our strength is in the equipment we can make available from Drilling rigs from 50 ton to 500 ton with all support equipment like mud pumps and mud cleaning systems to the highest standard.
  • As you can see from the projects completed with the Maxi rigs using intersection technology, we can do crossing length up to 3600 meters in length.
  • The key management and drilling personnel are having 15-20 years’ experience in the directional drilling industry which is the key to success in directional drilling long crossings

Equipment Available

Directional Drilling Rigs

Rig CapacityQuantity
30-60 Ton6
90-150 Ton8
200-350 Ton6
400-500 Ton4

Projects

Projects

Services

Service
Specialist Service

Pipeline Construction

Specialist Service

Horizontal Directional Drilling (HDD)

Specialist Service

Micro Tunneling & Pipe Jacking

Specialist Service

Composite Wrapping for FBE pipe Coating Protection

Specialist Service

Pipeline Spacers

Specialist Service

Sand / Soil Stabilization of Pipe Line Berms & ROW

Specialist Service

HDPE - Tight Fit Lining