HDPE / PE-RT TIGHT FIT LINING

HDPE & PE-RT Tight Fit Lining for Pipeline Rehabilitation

Scorpion Arabia delivers advanced HDPE and PE-RT tight fit lining solutions to rehabilitate aging pipelines, prevent corrosion, and extend service life without full pipeline replacement.

HDPE and PE-RT tight fit lining is a trenchless pipeline rehabilitation method used to restore and protect existing pipelines from the inside.

The process involves installing a high-performance polymer liner inside the host pipe, creating a close-fit internal barrier that protects against corrosion, abrasion and chemical attack. Once installed, the liner forms a continuous, joint-free surface that improves flow performance and extends the operational life of the pipeline.

Scorpion Arabia delivers tight fit lining solutions for pipelines where replacement is impractical, costly or disruptive.

Award Winning
0 +

Many pipelines remain structurally sound but suffer from internal corrosion, scaling, leakage or reduced flow capacity. Full replacement in such cases often results in unnecessary cost, downtime and surface disruption.

HDPE and PE-RT tight fit lining provides a cost-effective, low-disruption alternative by rehabilitating the pipeline internally while keeping the existing asset in place.

Key challenges addressed by tight fit lining include:

By lining instead of replacing, operators protect their investment and restore performance with minimal operational impact.

How HDPE / PE-RT Tight Fit Lining Is Installed

Scorpion Arabia applies a controlled and proven installation methodology to ensure reliable liner performance.

Scorpion Arabia’s tight fit lining solutions are suitable for a wide range of pipeline sizes and applications.

Typical parameters include:

Applications include:

Each project is evaluated to confirm technical suitability before execution.

HDPE and PE-RT tight fit lining is often used as part of a broader pipeline strategy.

At Scorpion Arabia, lining works are coordinated with:

This ensures a consistent, end-to-end approach to pipeline integrity.

All tight fit lining works are executed under controlled procedures and strict quality standards.

Scorpion Arabia ensures:

Our focus is on delivering reliable, long-term performance, not temporary fixes.

What our

clients say

Clients trust Scorpion Arabia because we understand both pipeline construction and rehabilitation.