Project Description: Sinopec Project – PKG-17 (KM 132 DDS)
This project involved the execution of a Directional Drilling System (DDS) / Horizontal Directional Drilling (HDD) scope under Sinopec Project PKG-17 in Saudi Arabia, delivered for ARAMCO.
The scope of work included the installation of a 12-inch steel pipeline using HDD methodology over a drilling length of 150 meters, forming part of a larger 132-kilometer pipeline package. The HDD operation was carried out in soft ground conditions, requiring controlled drilling, bore stability management, and precise alignment to meet engineering and safety standards.
All activities were executed in strict compliance with project specifications, quality requirements, and environmental guidelines, ensuring seamless integration with the overall pipeline network. The project commenced in January 2023 and was completed in alignment with client and contractor expectations.
Project Start: January 2023
Execution Method: HDD / DDS
Pipe Specification: 12” Steel Pipe
HDD Length: 150 meters
Ground Conditions: Soft Ground
Client: ARAMCO
This project highlights proven capability in short-to-medium length HDD crossings, oil & gas pipeline installations, and execution under demanding site and ground conditions within Saudi Arabia.
Project Gallery
Specifications
Pipeline Diameter: 12 inches
A 12-inch diameter pipeline was selected to meet project flow requirements while ensuring structural integrity and long-term operational reliability.
Pipeline Material: Carbon Steel
High-grade carbon steel pipe was used to provide durability, pressure resistance, and compliance with oil and gas industry standards.
HDD Crossing Length: 150 meters
The HDD crossing covered a total drilled length of 150 meters, executed with controlled drilling parameters to maintain accuracy and bore stability throughout the operation.
Total Pipeline Package Length: 132 kilometers
The HDD crossing formed part of a larger 132-kilometer pipeline package, contributing to the overall network connectivity and infrastructure development.
Ground Conditions: Soft Ground
The project was executed in soft ground conditions, requiring careful drilling fluid management and bore support techniques to prevent collapse and ensure smooth pipe installation.
Drilling Profile: Straight / Controlled Bore (as per approved alignment)
A straight, survey-controlled bore profile was maintained in accordance with the approved engineering alignment to ensure accurate entry and exit positioning.
Installation Method: Pilot Drilling, Reaming, and Pipe Pull-Back
The installation was carried out through a sequential HDD process consisting of pilot hole drilling, progressive reaming to the required diameter, and final pipe pull-back.
Project Information
Sinopec Project PKG-17 KM 132 DDS
12" Pipe Size km 132
PROJECT BY
ARAMCO
METHOD
HDD
PIPE DIAMETER
12" steel pipe
LENGTH (M)
150